Painting and Installing the electrics

So we finished the painting, with a lot of help from friends. The next jobs are to finish the electrics and start to install the plumbing (kitchenette, tankless boiler, shower, toilet, basin)

here yu can see the light fittings i picked, and the internal bathroom window that we fitted.

Also the kitchenette unit, its got a fridge freezer, hobs and basin. super small but i didn't want it taking up too much space, and its easy to remove if we want to.


Featured Posts
Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

SH

© 2023 by EK. Proudly created with Wix.com